What affects the installation period?

Quantity, floors, layout complexity, weather, lifting conditions and service works all affect the actual schedule. Standardised units are usually easier to organise at scale.

What should the site prepare?

The site needs transport and lifting access. Foundations or support surfaces should be level and reliable, and water, power, drainage and earthing points should match the approved plan.

What should be checked after installation?

Inspect structural connections, roof waterproofing, door and window operation, electrical safety and drainage falls before the space is put into use. Plan routine maintenance afterward.